Erecting wall panels

First task was to move the many of the panels to a more convenient location.

Putting up a SIP wall panel. It was very easy to erect the wall panel as they are basically two 4×8 OSBs sandwiching 6″ of polystyrene. They can easily be lifted by two people.

The panels went up very quickly. A 110′ section of wall only took a morning.

“Scenic” shot of one of the large West wall panels being installed.